| Project Name | Owner | Closing Date |
|---|
| NORTH CAMPUS DEMOLITION PROJECT | City of Aurora | 12/10/2026 02:00 PM MST |
| Region 4 – US 40 Surface Treatment | | 11/19/2026 10:00 AM MST |
| Region 3 – SH13A & SH 64A Resurfacing | | 11/19/2026 10:00 AM MST |
| Region 2 – US 50B VRU Intersection Improvements | | 11/19/2026 10:00 AM MST |
| Region 1 – SH 79 Resurfacing | | 11/19/2026 10:00 AM MST |
| Region 5 – Resurfacing on SH 15B, SH 136A and SH 371A | | 11/19/2026 10:00 AM MST |
| Notice Final Settlement: 2025.239-2025 Miscellaneous Steel Bridge Rail Repairs | Adams County | 11/23/2026 05:00 PM MST |
| 2027 Asphalt Overlay and Full Depth Reclamation Project | Town of Castle Rock | 12/08/2026 08:30 AM MST |
| 2027 Curb, Gutter & Sidewalk | Town of Castle Rock | 12/08/2026 09:00 AM MST |
| 2027 Slurry Seal | Town of Castle Rock | 12/08/2026 10:00 AM MST |
| 2027 Town Facility Parking Lot Improvements | Town of Castle Rock | 12/08/2026 09:30 AM MST |
| Notice of Final Payment CONSTRUCTION OF FURROW ROAD MINI CIRCULAR INTERSECTIONS | El Paso County | 11/18/2026 04:30 PM MST |
| Region 5 – CO 145 Rockfall Mitigation | | 11/19/2026 10:00 AM MST |
| Orchard Hills Park Pedestrian Bridge Abutments | City of Greenwood Village | 11/20/2026 01:00 PM MST |
| Village Green Concrete Channel Conversion | City of Colorado Springs | 11/13/2026 04:00 PM MST |
| Design and Engineering Services for Water and Wastewater Treatment Facilities | City of Fort Collins | 11/20/2026 03:00 PM MST |
| Christman Field Taxiway and Hangar Repave | Colorado State University Construction | 11/19/2026 12:00 PM MST |
| Monument Creek at Mark Dabling Blvd Channel Stabilization Greenway Trail | City of Colorado Springs | 12/03/2026 02:00 PM MST |
| Quebec Street Widening – North of 136th Avenue | City of Thornton | 11/20/2026 03:00 PM MST |
| Solid Waste Center On-Call General Engineering Services | Pitkin County | 11/20/2026 02:00 PM MST |
| Libraries + Shade Structure CM/GC | City and County of Denver Department of Transportation and Infrastructure | 12/15/2026 02:00 PM MST |
| On-Call Construction III: Suspended Pipeline Insulation Removal & Remediation | City of Aurora | 11/19/2026 02:00 PM MST |
| Y–LB Lateral Water Line and Facilities Replacement for Wastewater System | | 11/11/2026 06:00 PM MST |
| Sterling 9+1 Bay VSF | CDOT CPCS & PROPERTY MANAGEMENT | 12/03/2026 02:00 PM MST |
| ENDERUD AND MIKELSON INTERSECTION IMPROVEMENTS | Town of Castle Rock | 11/17/2026 03:00 PM MST |
| Professional Services | City and County of Broomfield | 12/21/2026 02:00 PM MST |
| RFP 2026-021 Post-Construction Electric Distribution Inspection Services | United Power, Inc. | 12/03/2026 11:00 AM MST |
| Arapahoe County Fairgrounds: South Lawns Irrigation Renovation | Arapahoe County | 11/30/2026 02:00 PM MST |
| Notification of Final Settlement – Main at Miramonte Improvements Project | City and County of Broomfield | 11/05/2026 05:00 PM MST |
| Crack Sealing Repairs (2026) | City of Greeley | 12/01/2026 11:00 AM MST |
| Coffman Street Extension | City of Longmont | 12/02/2026 02:00 PM MST |
| 2026-1119-002 Trailer Mounted Vacuum Excavator | Morgan County | 11/18/2026 04:00 PM MST |
| Region 5 – SH 3 Resurfacing | | 11/12/2026 10:00 AM MST |
| Region 1 – US 285 Resurfacing | | 11/12/2026 10:00 AM MST |
| Region 2 – US 50 Resurfacing | | 11/12/2026 10:00 AM MST |
| Region 3 – Roundabout Construction at US 24 & CO 82 | | 11/12/2026 10:00 AM MST |
| RFQ#FY26-017 37th Street Widening Phase 4 Design | City of Evans | 11/27/2026 11:59 PM MST |
| Coal Creek Sewer Rehabilitation – 2025 Collection Systems Improvement Project | City of Lafayette | 11/18/2026 05:00 PM MST |
| CU-Boulder-UCB001642-MBE – Idea Forge Renovation | University of Colorado Design and Construction | 11/23/2026 02:00 PM MST |
| JELA 325250 335621 – Rehabilitate Cemetery | | 12/10/2026 03:00 PM MST |
| ARDEC Kerbel Well Replacement | Colorado State University Construction | 12/08/2026 12:00 PM MST |
| CU Boulder-UCB001665-CAMP-ICR-Preliminary Planning and Design FY27-28 | University of Colorado Design and Construction | 11/30/2026 02:00 PM MST |
| 2026 South Platte River Bank Stabilization (Prime Contractors) | City of Aurora | 11/10/2026 02:00 PM MST |
| Repair C Basin Sanitary Sewer Outfall Phases 2 & 3 | Colorado State University Construction | 11/13/2026 12:00 PM MST |
| Boettcher Concert Hall Renovation CM/GC | City and County of Denver Department of Transportation and Infrastructure | 12/02/2026 02:00 PM MST |
| RFQ-CIVIL ENGINEERING ON-CALL SERVICES | Town of Windsor | 12/08/2026 04:00 PM MST |
| Administrative Parking Lot Repairs | | 11/23/2026 12:00 PM MST |
| On-Call Professional Services Program | El Paso County | 12/09/2026 02:00 PM MST |
| Rifle Trades Center Renovation | Colorado Mountain College | 11/19/2026 02:00 PM MST |
| 2026 Traffic Signal Plan for STEVEN D HOGAN PKWY and E-470 | City of Aurora | 11/10/2026 03:00 PM MST |
| Adams County Health Department – Environmental Health Renovation | Adams County | 11/18/2026 04:00 PM MST |
| Paving Acquisition Vehicle – Rockies (PAV-R) IDIQ Sources Sought | | 11/20/2026 10:00 AM MST |
| Stove Prairie Campground Gate Replacement | | 11/11/2026 12:00 PM MST |
| RFQ Prof Engineering Svcs Chambers Road Crowfoot Valley Road to Stroh Road | Town of Parker | 11/13/2026 05:00 PM MST |
| Longmont-to-Boulder (LoBo) Trail Jay Road Connection Project | | 11/12/2026 02:00 PM MST |
| AVC Spur & Delivery Lines, SRF Project – Construction Manager/General Contractor | Southeastern Colorado Water Conservancy District | 11/19/2026 02:00 PM MST |
| RFP# 144-26 / Clocktower Plaza Design | City of Canon City | 11/12/2026 11:00 AM MST |
| Pavement Management Road Inventory for 2027 | | 11/19/2026 02:00 PM MST |
| Request for Interest: San Luis Valley Potato Research Facility | Colorado State University Construction | 11/18/2026 12:00 PM MST |
| Clark Centennial Park | City of Longmont | 11/13/2026 02:00 PM MST |
| CU Boulder-UCB001622-SITE-NBC-Irrigation System & Landscape Improvements | University of Colorado Design and Construction | 11/09/2026 05:00 PM MST |
| Region 2 – US 24 Turn Lane Improvements | | 11/05/2026 10:00 AM MST |
| Region 4 – CO 66 Resurfacing | | 11/05/2026 10:00 AM MST |
| Region 4 – US 85 Chipseal | | 11/12/2026 10:00 AM MST |
| CU Boulder-UCB001155- MULTI-Rooftop Safety (2024-113M23) | University of Colorado Design and Construction | 11/30/2026 12:00 PM MST |
| Z–BRCA 310427 Southbound Shuttle Stop | | 11/16/2026 11:00 AM MST |
| Town Center Infrastructure – Design | Town of Bennett | 11/05/2026 04:00 PM MST |
| Notice of Final Payment – Annual Concrete Maintenance – Task Order 12 | El Paso County | 11/04/2026 04:00 PM MST |
| CIP25-036 Dransfeldt Motsenbocker Turn Lane | Town of Parker | 11/04/2026 11:00 AM MST |
| Woodmen Hills Metropolitan District Stormwater and Influent Improvements | Woodmen Hills Metropolitan District | 11/12/2026 02:00 PM MST |
| CIP25-025 – Public Works Operation Center Decant Facility Expansion | Town of Parker | 11/10/2026 10:00 AM MST |
| CMAR for the Big Dry Creek 54-inch Interceptor Rehabilitation Project | City of Westminster | 11/10/2026 04:00 PM MST |
| RFP – 30-in Cherry Creek Parallel Interceptor | Parker Water & Sanitation District | 11/13/2026 02:00 PM MST |
| CSU SPUR HYDRO Stormwater Pump Station | Colorado State University Construction | 12/04/2026 12:00 PM MST |
| SMFR-26-1015 JOINT SERVICES TRAINING FACILITY BURN BUILDING | South Metro Fire Rescue | 11/09/2026 02:00 PM MST |
| Cottonwood Creek Stabilization – Academy to Union | City of Colorado Springs | 11/16/2026 03:00 PM MST |
| Engineering Consulting and Related Services | United Power, Inc. | 11/20/2026 11:00 AM MST |
| Grand Junction Mobility Hub | CDOT CPCS & PROPERTY MANAGEMENT | 11/05/2026 02:00 PM MST |
| Walker Augmentation Reservoir Site Improvements | City of Aurora | 11/16/2026 02:00 PM MST |
| 2027 Redstone Area Snow Removal Services | Pitkin County | 11/09/2026 02:00 PM MST |
| RFP 27-07 Fire Sprinkler System and Portable Extinguisher Services | Boulder Valley School District | 11/05/2026 10:00 AM MST |
| Galeton Drainage Project | Weld County | 11/05/2026 10:00 AM MST |
| CU Boulder-UCB001153-ECOT-Window Replacement (2025-082M24)-Phase 1 | University of Colorado Design and Construction | 11/06/2026 09:00 AM MST |
| Timucuan Ecological and Historic Preserve TIMU-335 | | 11/06/2026 03:00 PM MST |
| Construction Services Cozy Point Ranch Cabin Expansion | City of Aspen | 11/12/2026 02:00 PM MST |
| Professional Engineering Services: New Union Ditch Channel & Headgate | City of Thornton | 11/05/2026 04:00 PM MST |
| RidgeGate Hillcamp Trail Roadway Project | | 11/12/2026 02:00 PM MST |
| Bunker Renovation at Walnut Creek Golf Preserve | City of Westminster | 11/10/2026 02:30 PM MST |
| Aztlan Outdoor Pool Replacement CM/GC | City and County of Denver Department of Transportation and Infrastructure | 11/05/2026 02:00 PM MST |
| LARO 258755 – Replace Dilapidated Docks and Fuel S | | 11/10/2026 05:00 PM MST |
| RidgeGate Hillcamp Water Booster Pump Station Project | | 11/18/2026 03:00 PM MST |
| Z–YELL 338223 – Bridge Preservation | | 11/06/2026 02:00 PM MST |
| Engineering Design Service – Peyton School District Wastewater Treatment System Improvements | | 11/10/2026 12:00 PM MST |
| RFP 26-001 Memorial Stadium Improvements | Westminster Public Schools | 11/10/2026 02:00 PM MST |
| Y–GRTE 237343 – Rehab 4 Lazy F Ranch | | 11/20/2026 03:00 PM MST |